Implementation of Mechanized Bridge (Machine Ghirling)

Posted under Uncategorized by admin on Sunday 25 October 2009 at 10:51 am

The implementation of the Mechanized Bridge (Machine Ghirling) in different part of our country is one of our successful project. Following are the recent activities on this project.

  • With the technical assistance of Integrated Technology Development, Nepal (ITD Nepal) a mechanized bridge is developed. After successful testing up to 1500M span, now it is under construction over Seti river connecting Dulegaunda-2, Kotre, Tanahun and Bharat Pokhari-1, Punditar, Kaski and span more than 520M.This type of bridge can be applicable for typical location of Nepali contest in the sense of topography, cost, span and technology.
  • With the technical assistance of ITD Nepal, carry out survey, design, cost estimation and socio-economic analysis works of Mechanized Bridge over Seti River connecting Dulegaunda-2, Kotre, Tanahun and Bharat Pokhari-1, Punditar, Kaski.
  • With the technical assistance of ITD Nepal Standardization of Mechanized Bridge for different spans ranging from 400 to 1500m.
    • Carry out survey, design, cost estimation and socio-economic analysis works of Dhansari-Belsot Mechanized Bridge (River Crossing Cable Car) having 620m span at Dhansari-Belsot, Tandi VDC, Sindhuli District over Kamala River.
    • In association with ITD Nepal and GREAT Nepal, Carry out survey, design, cost estimation and socio-economic analysis works of Yakchanaghat Mechanized Bridge (680m span) at Khuwaphok VDC, Yakchanaghat, Dhankuta District over Tamor River.
  • Now there is a high demand from local group and people for this bridge from various place of Nepal and some surveys are also completed by ITD Nepal and GREAT Nepal.