Implementation of Mechanized Bridge (Machine Ghirling)
The implementation of the Mechanized Bridge (Machine Ghirling) in different part of our country is one of our successful project. Following are the recent activities on this project.
- With the technical assistance of Integrated Technology Development, Nepal (ITD Nepal) a mechanized bridge is developed. After successful testing up to 1500M span, now it is under construction over Seti river connecting Dulegaunda-2, Kotre, Tanahun and Bharat Pokhari-1, Punditar, Kaski and span more than 520M.This type of bridge can be applicable for typical location of Nepali contest in the sense of topography, cost, span and technology.
- With the technical assistance of ITD Nepal, carry out survey, design, cost estimation and socio-economic analysis works of Mechanized Bridge over Seti River connecting Dulegaunda-2, Kotre, Tanahun and Bharat Pokhari-1, Punditar, Kaski.
- With the technical assistance of ITD Nepal Standardization of Mechanized Bridge for different spans ranging from 400 to 1500m.
- Carry out survey, design, cost estimation and socio-economic analysis works of Dhansari-Belsot Mechanized Bridge (River Crossing Cable Car) having 620m span at Dhansari-Belsot, Tandi VDC, Sindhuli District over Kamala River.
- In association with ITD Nepal and GREAT Nepal, Carry out survey, design, cost estimation and socio-economic analysis works of Yakchanaghat Mechanized Bridge (680m span) at Khuwaphok VDC, Yakchanaghat, Dhankuta District over Tamor River.
- Now there is a high demand from local group and people for this bridge from various place of Nepal and some surveys are also completed by ITD Nepal and GREAT Nepal.