Gravity Ropeway

Posted under Uncategorized by admin on Friday 23 October 2009 at 9:50 am

We have done the following jobs in Gravity Ropeway project.

  • Base line survey, Detailed Survey, Design, cost estimation, economic Analysis of Gravity Ropeway for the transportation of goods in Tanahun, Gorkha, Kalikot and Achham District supported by Practical Action Nepal.
  • Detailed Survey, Design and Cost Estimate of Gravity Ropeway at Jukot, Bajura District for Human Resource Center, Bajura in partnership with Poverty Alleviation Fund (PAF).
  • Detailed Survey, Design and Cost Estimate of Gravity Ropeway at Khaptad, Achham District for Nepal Updit Uthan Samaj (NUDS) in partnership with Poverty Alleviation Fund (PAF).
  • In association with ITD Nepal and GREAT Nepal, Carry out survey, design, cost estimation, economic analysis works, construction supervision and Installation of Majhim Tar Gravity Ropeway (480m span) at Majhimtar VDC, Dhading District to carry limestone for raw material of cement invest by Shaktiman Cement.
  • In partnership with SAPPROS Nepal under the support of Poverty Alleviation Fund for Krishi Utthan community organization, Carry out survey, design and cost estimation of Bagada Gravity Ropeway (Length:1400m, Elevation Diff: 650m) at Dangaji VDC-8, Bagada, Bajhang District for the transportation of Apple, Wallnut, Potato etc.
  • In partnership with Focus Nepal under the support of Poverty Alleviation Fund for papal danda community organization, Carry out survey, design and cost estimation of Pipal Danda Gravity Ropeway (Length: 1800m, Elevation Diff: 556m) at Jogimara VDC-6,7,8, Pipal Danda, Dhading District for the transportation of Cash crops and Vegetable  etc.
  • In partnership with Focus Nepal under the support of Poverty Alleviation Fund for Dhusa community organization, Carry out survey, design and cost estimation of Dhusa Gravity Ropeway (Length:2500m, Elevation Diff: 813m) at Dhusa VDC-2,3,4,5,6, Dhusa, Dhading District for the transportation of Cash crops and Vegetable  etc.
  • Carry out survey, design and cost estimation of Majh Gaun Gravity Ropeway (Length: 1523, Elevation Diff: 623m) at Darechowk VDC, Chulingtar-Ruplang (Prithiwi Highway- Village), Chitwan District for the transportation of Cash crops and Vegetable etc.
  • Carryout feasibility study, fabrication and installation of Chandibhanjyang Gravity Ropeway: Technology for Access, Access for Technology” awarded by Nepal Development market palace 2008