Implementation of Tuin (Ghirling) River Crossing Technology

Posted under Uncategorized by admin on Sunday 25 October 2009 at 10:52 am

We have successfully implement the Tuin (Ghirling) River Crossing Technology in different places of our country Nepal. Following are our recent activities in implementation of this technology.

  • Survey, Design and cost estimation of  Tuin (Ghirling) with sag controlled cable as a demonstration site at Tanahun, Gorkha, Achham and Kalikot District (6 No) supported by Practical Action Nepal.
  • In partnership with Practical Action Nepal, Construction Supervision and Installation of Modified Tuin (Ghirling) with sag controlled cable as a demonstration site at Trishuli River connecting wards No. 9 of Pangrichowk VDC of Gorkha at right bank and Darechowk VDC -8, of Chitwan District in left bank.
  • In partnership with Practical Action Nepal, Construction Supervision and Installation of Modified Tuin (Ghirling) with sag controlled cable as a demonstration site at Trishuli River connecting wards No. 9 of Pangrichowk VDC of Gorkha at right bank and Darechowk VDC -8, of Chitwan District in left bank.
  • In partnership with SAPPROS Nepal under the support of Poverty Alleviation Fund for Ekata Samaj community organization, Carry out survey, design and cost estimation of Kukachuli Tuin (Ghirling) (35m span) at Dahabagar VDC, Ward No 1, Daud, Bajhang District over Kalanga River.
  • Survey, Design, Cost Estimation, Supervision and Installation of Dhundure-Malebagar Sag Controlled Tuin having 160 m Span awarded by Ministry of Education at Dulegaunda-Dhorphirdi Tanahun across Seti River.

Implementation of Mechanized Bridge (Machine Ghirling)

Posted under Uncategorized by admin on Sunday 25 October 2009 at 10:51 am

The implementation of the Mechanized Bridge (Machine Ghirling) in different part of our country is one of our successful project. Following are the recent activities on this project.

  • With the technical assistance of Integrated Technology Development, Nepal (ITD Nepal) a mechanized bridge is developed. After successful testing up to 1500M span, now it is under construction over Seti river connecting Dulegaunda-2, Kotre, Tanahun and Bharat Pokhari-1, Punditar, Kaski and span more than 520M.This type of bridge can be applicable for typical location of Nepali contest in the sense of topography, cost, span and technology.
  • With the technical assistance of ITD Nepal, carry out survey, design, cost estimation and socio-economic analysis works of Mechanized Bridge over Seti River connecting Dulegaunda-2, Kotre, Tanahun and Bharat Pokhari-1, Punditar, Kaski.
  • With the technical assistance of ITD Nepal Standardization of Mechanized Bridge for different spans ranging from 400 to 1500m.
    • Carry out survey, design, cost estimation and socio-economic analysis works of Dhansari-Belsot Mechanized Bridge (River Crossing Cable Car) having 620m span at Dhansari-Belsot, Tandi VDC, Sindhuli District over Kamala River.
    • In association with ITD Nepal and GREAT Nepal, Carry out survey, design, cost estimation and socio-economic analysis works of Yakchanaghat Mechanized Bridge (680m span) at Khuwaphok VDC, Yakchanaghat, Dhankuta District over Tamor River.
  • Now there is a high demand from local group and people for this bridge from various place of Nepal and some surveys are also completed by ITD Nepal and GREAT Nepal.

Gravity Ropeway

Posted under Uncategorized by admin on Friday 23 October 2009 at 9:50 am

We have done the following jobs in Gravity Ropeway project.

  • Base line survey, Detailed Survey, Design, cost estimation, economic Analysis of Gravity Ropeway for the transportation of goods in Tanahun, Gorkha, Kalikot and Achham District supported by Practical Action Nepal.
  • Detailed Survey, Design and Cost Estimate of Gravity Ropeway at Jukot, Bajura District for Human Resource Center, Bajura in partnership with Poverty Alleviation Fund (PAF).
  • Detailed Survey, Design and Cost Estimate of Gravity Ropeway at Khaptad, Achham District for Nepal Updit Uthan Samaj (NUDS) in partnership with Poverty Alleviation Fund (PAF).
  • In association with ITD Nepal and GREAT Nepal, Carry out survey, design, cost estimation, economic analysis works, construction supervision and Installation of Majhim Tar Gravity Ropeway (480m span) at Majhimtar VDC, Dhading District to carry limestone for raw material of cement invest by Shaktiman Cement.
  • In partnership with SAPPROS Nepal under the support of Poverty Alleviation Fund for Krishi Utthan community organization, Carry out survey, design and cost estimation of Bagada Gravity Ropeway (Length:1400m, Elevation Diff: 650m) at Dangaji VDC-8, Bagada, Bajhang District for the transportation of Apple, Wallnut, Potato etc.
  • In partnership with Focus Nepal under the support of Poverty Alleviation Fund for papal danda community organization, Carry out survey, design and cost estimation of Pipal Danda Gravity Ropeway (Length: 1800m, Elevation Diff: 556m) at Jogimara VDC-6,7,8, Pipal Danda, Dhading District for the transportation of Cash crops and Vegetable  etc.
  • In partnership with Focus Nepal under the support of Poverty Alleviation Fund for Dhusa community organization, Carry out survey, design and cost estimation of Dhusa Gravity Ropeway (Length:2500m, Elevation Diff: 813m) at Dhusa VDC-2,3,4,5,6, Dhusa, Dhading District for the transportation of Cash crops and Vegetable  etc.
  • Carry out survey, design and cost estimation of Majh Gaun Gravity Ropeway (Length: 1523, Elevation Diff: 623m) at Darechowk VDC, Chulingtar-Ruplang (Prithiwi Highway- Village), Chitwan District for the transportation of Cash crops and Vegetable etc.
  • Carryout feasibility study, fabrication and installation of Chandibhanjyang Gravity Ropeway: Technology for Access, Access for Technology” awarded by Nepal Development market palace 2008