With the technical assistance of (ITD Nepal), a Local wind pump is developed and successfully tested on Bajrahiguthi saptari, which is very suitable for Terai region for Nepal, Where the farmers are using diesel pump for irrigating their farm. Environmental Conservation Camp Awareness (ECCA) supports for the development of second type of Local wind Pump [...]
Solar Water Pumping in Bhujikot
Solar pumping water supply project is completed in Bhujikot Tanahun, by which more than 435 persons of 67 house holds located at Bhujikot, kami gaun, Thanthok, Bhandarigaun (Dulegauda and Khairenitar VDC), supported by World Bank, under the national competition of Nepal Development Market palace 2005, ‘Launa abata kehi garaun’.
Implementation of Tuin (Ghirling) River Crossing Technology
We have successfully implement the Tuin (Ghirling) River Crossing Technology in different places of our country Nepal. Following are our recent activities in implementation of this technology.
Survey, Design and cost estimation of Tuin (Ghirling) with sag controlled cable as a demonstration site at Tanahun, Gorkha, Achham and Kalikot District (6 No) supported by Practical Action [...]
Implementation of Mechanized Bridge (Machine Ghirling)
The implementation of the Mechanized Bridge (Machine Ghirling) in different part of our country is one of our successful project. Following are the recent activities on this project.
With the technical assistance of Integrated Technology Development, Nepal (ITD Nepal) a mechanized bridge is developed. After successful testing up to 1500M span, now it is under construction [...]